A: REMOVAL
1) Change the front hood damper mounting position
from (A) to (B), and completely open the front
hood.
Tightening torque:
20 N*m (2.0 kgf-m, 14.8 ft-lb)
2) Remove the V-belt covers.
3) Collect the refrigerant from A/C system. <Ref. to
AC-24, Refrigerant Recovery Procedure.>
4) R
A: REMOVAL
1. CROSSMEMBER AND CUSHION RUBBER
1) Disconnect the ground cable from battery.
2) Lift up the vehicle.
3) Remove the front under cover. <Ref. to EI-35, REMOVAL, Front Under Cover.>
4) Remove the front and center exhaust pipes. (non-turbo model) <Ref. to EX(H4SO)-5, REMOVAL,