A: REMOVAL
1) Change the front hood damper mounting position
from (A) to (B), and completely open the front
hood.
Tightening torque:
20 N*m (2.0 kgf-m, 14.8 ft-lb)
2) Remove the V-belt covers.
3) Collect the refrigerant from A/C system. <Ref. to
AC-24, Refrigerant Recovery Procedure.>
4) R
Only one person should be involved in refueling. Do not allow others to approach
the area of the vehicle near the fuel filler pipe while refueling is in progress.
Be sure to observe any other precautions that are posted at the service station.
1. To open the fuel filler lid, pull the lid relea