Subaru Outback manuals

Subaru Outback (BR): Body

READ NEXT:

 HVAC System (Heater, Ventilator and A/C)

 General Description of Heater, Ventilator, A/C

A: SPECIFICATION 1. HEATER SYSTEM 2. A/C SYSTEM 3. BASIC OPERATION The cooling system cools down the compartment by using the pipes connecting parts and cycling the evaporable liquid (refrige

 Air Conditioning System

A: WIRING DIAGRAM Refer to "Air Conditioning System" in the wiring diagram. <Ref. to WI-53, WIRING DIAGRAM, Air Conditioning System.> B: ELECTRICAL SPECIFICATION Refer to "Auto A/C Control Modu

SEE MORE:

 Oil Charge Pipe

A: REMOVAL 1) Disconnect the ground cable from battery. 2) Lift up the vehicle. 3) Remove the under cover. <Ref. to EI-35, REMOVAL, Front Under Cover.> 4) Remove the front exhaust pipe. <Ref. to EX(H6DO)-5, REMOVAL, Front Exhaust Pipe.> 5) Disconnect the connector from turbine speed

 Convenient tie-down hooks (if equipped)

CAUTION The convenient tie-down hooks are designed only for securing light cargo. Never try to secure cargo that exceeds the capacity of the hooks. The maximum load capacity is 44 lbs (20 kg) per hook. The cargo area is equipped with four tiedown hooks so that cargo can be secured with a l

© 2010-2025 Copyright www.suoutback.com